Our Services

Customer Oriented Effective Solutions

Elektrakom offers reliable, quality and standards-compliant engineering solutions with its experienced staff and 20 years of industry experience.

Solutions

High Voltage Substations 
Turn key substations for all voltage levels in Turkish electricty standards TEIAS, between 154 kV and 380 kV, full design, procurement, installation, tests and commissioning scopes. Besides, all other HV levels like 110 kV, 220 kV or 500 kV susbtations is in our experienced area at abroad projects. 


Monitoring and Control Systems 
SCADA and RTU systems, in order to control and monitoring of substations as remotely and locally. Most known protocols IEC101, DNP and especially IEC61850 is widely used in these systems. Besides, we design and install the National Monitoring and Control Systems known as control centers. 


Communication Systems 
Required communication infrastructures to interconnect between subststions and control centers. Latest trend of monitiring system known as Smart Grid, needs hybrid communication key solutions and we do all kind detailed desings including site surveys and analyses. 


High Voltage AIS/GIS Substations 
Turn key substations for all voltage levels in Turkish electricty standards TEIAS, between 154 kV and 380 kV, full design, procurement, installation, tests and commissioning scopes. Besides, all other HV levels like 110 kV, 220 kV or 500 kV susbtations is in our experienced area at abroad projects.

  • Project Design

  • Primary &Secondary Electrical Design

  • Civil Project Design

  • Short Circuit Calculations

  • Test&Commissioning
Elektrakom Energy